Author | Presentation | Download | Size |
---|---|---|---|
A. Parmar | XMM-Newton Mission Status | mission_status.pdf | 180 Kb |
R. Munoz | Instrument Operations / Data Generation | instrument_operations.pdf | 1.4 Mb |
N. Schartel | Report from the Project Scientist | science_report.pdf | 14.2 Mb |
P. Rodriguez | New Operations Strategy after RF Switch Failure | new_operations.pdf | 708 Kb |
I. de la Calle | EPIC Background Treatment | background_treatment.pdf | 836 Kb |
M. Guainazzi | EPIC Calibration Status | epic_calib.pdf | 29.8 Mb |
A. Pollock | RGS Calibration Status | rgs_calib.pdf | 1.6 Mb |
A. Talavera | OM Calibration Status | om_calib.pdf | 8.7 Mb |
M. Stuhlinger | Cross-calibration Status | cross_calib.pdf | 4.3 Mb |
C. Gabriel | SAS Developments and Future Plans | sas_status.pdf | 7.6 Mb |
M. Watson | SSC Status | ssc_status.pdf | 5.3 Mb |
M. Ehle | Action Items from last Meeting | action_items.pdf | 312 Kb |