Author | Presentation | Download | Size |
---|---|---|---|
A. Parmar | Overall Mission Status | mission_status.pdf | 456 Kb |
R. Muñoz | Instrument Operations | instrument_operations.pdf | 132 Kb |
N. Schartel | Report of the Project Scientist | science_report.pdf | 1.3 Mb |
M. Ehle | User Support and Mission Planning | usg.pdf | 7.9 Mb |
M. Guainazzi | Calibration | calibration.pdf | 12.8 Mb |
C. Gabriel | SAS Developments and Future Plans | sas_status.pdf | 1.2 Mb |
N. Loiseau | Science Archive and Future Plans | xsa.pdf | 3.7 Mb |
M. Watson | SSC Status | ssc_status.pdf | 5.0 Mb |
M. Ehle | Action Items from Last Meeting | action_items.pdf | 105 Kb |
N. Schartel | Joint Programmes | joint_programs.pdf | 32 Kb |